Thursday, June 16, 2011

Pt 1, build an electric motor Heli Training / Test

Pt 1, build an electric motor Heli Training / Test Tube. Duration : 10.02 Mins.


Heli test / training available. Dave Herbert. to make 1, 24 "x 24" plywood base circle: parts required. 1, 24 "long and 2x2 cm wide strips of insulating foam (cut 2x2x2" squares 1 ¼ x 21 "round wooden stick Ramin sliding. 1 ¾" pipe x 24 "galvanized threaded (it must be difficult), then the pattern 1. ¾ "floor flange with 4, 1 ½" x 3 / 16 "long screws and nuts to attach it to the grassroots level. 1, 3 / 8" x 2 ½ "stove bolt (round head, no slot) 2 large 3 / 8 "Washer and two 8.3" Nuts 2, 3 ½ "long x ¾" wide, slightlySprings 1, ½ twist "Long x 1 / 8" wood 1, 5 / 16 small holes (4.1 "), disc, spring stopper on the underside of the tail. 1, 3" x 8 "x 3 / 16" ply or other strong material to the helicopter base mounting plate. 2 ¾ "strips to the wooden pole Ramin. 1, 1" clamps for galvanized pipe 1 ¼ "x 2 ½" long flat head screw to hold shaft fixing plate Ramin 1, 12 "long cable mini-bungee 8, # 60 rubber bands, four mounted on each side for helicopter landing gear on board. nylon 1, 12 cm in lengthSeat Belt "plaster" to make string. Heli loop on the plate structure and assembly. Take your time and follow the instructions carefully. 1. Measure exactly half of the 24 plywood "x24" cut off the base and the largest circle possible, such as wood. Sand and paint or stain as desired. 2. Drill the center hole to 3 / 8 "bolts in 3 / 8" x 2 ½ "stove bolt (round head towards the ground). Use large washers and nuts on both sides to adjust the length of the plan by 1 ½ "Wood, if 2x 2 x 2 ...

Keywords: Helicopter, Training, test, stand, Honeybee, Blade, 400, Mr.Herbert's, Science, Class, Dave, Herbert, RC, Nightflyyer

fatheadz sunglasses seychelle stainless steel water filter bottle

No comments:

Post a Comment